Two-staged early cost estimation for highway construction projects

Du Yon Kim, Byoungil Kim, Seung Heon Han

Research output: Chapter in Book/Report/Conference proceedingConference contribution

8 Citations (Scopus)

Abstract

The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various research have been attempted to develop cost prediction models in the early stage of a construction lifecycle. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the case-based reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.

Original languageEnglish
Title of host publicationISARC 2008 - Proceedings from the 25th International Symposium on Automation and Robotics in Construction
PublisherVilnius Gediminas Technical University
Pages490-495
Number of pages6
ISBN (Print)9789955283294
DOIs
Publication statusPublished - 2008
Event25th International Symposium on Automation and Robotics in Construction, ISARC 2008 - Vilnius, Lithuania
Duration: 2008 Jun 262008 Jun 29

Publication series

NameISARC 2008 - Proceedings from the 25th International Symposium on Automation and Robotics in Construction

Other

Other25th International Symposium on Automation and Robotics in Construction, ISARC 2008
Country/TerritoryLithuania
CityVilnius
Period08/6/2608/6/29

All Science Journal Classification (ASJC) codes

  • Artificial Intelligence
  • Computer Vision and Pattern Recognition
  • Building and Construction

Fingerprint

Dive into the research topics of 'Two-staged early cost estimation for highway construction projects'. Together they form a unique fingerprint.

Cite this