TY - GEN
T1 - Technical and economic assessment of chemical absorption process at LNG based power plant
AU - Lee, Seungmoon
AU - Song, Ho Jun
AU - Park, Jin Won
AU - Lee, Joon Ho
PY - 2007
Y1 - 2007
N2 - A discussion covers CO2 recovery from a newly constructed demo pilot plant with a 2 ton/day capacity; characteristics of the pilot plant, which was constructed near a 250 Mw LNG-based power plant; absorbents tested, e.g., MEA and blended absorbents containing primary, secondary, tertiary and sterically hindered amine; trends in the CO2 market; and economic aspects. This is an abstract of a paper presented at the 2007 AIChE Annual Meeting (Salt Lake City, UT 11/4-9/2007).
AB - A discussion covers CO2 recovery from a newly constructed demo pilot plant with a 2 ton/day capacity; characteristics of the pilot plant, which was constructed near a 250 Mw LNG-based power plant; absorbents tested, e.g., MEA and blended absorbents containing primary, secondary, tertiary and sterically hindered amine; trends in the CO2 market; and economic aspects. This is an abstract of a paper presented at the 2007 AIChE Annual Meeting (Salt Lake City, UT 11/4-9/2007).
UR - http://www.scopus.com/inward/record.url?scp=58049125552&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=58049125552&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:58049125552
SN - 9780816910229
T3 - 2007 AIChE Annual Meeting
BT - 2007 AIChE Annual Meeting
T2 - 2007 AIChE Annual Meeting
Y2 - 4 November 2007 through 9 November 2007
ER -