Abstract
The problem of scheduling jobs on identical parallel machines is investigated. The jobs are assumed to have sequence dependent setup times independent of the machine. Each job has a processing time, a due date, and a weight for penalizing tardiness. The objective of scheduling is to fine a sequence of the jobs which minimizes the sum of weighted tardiness. An extension of the ATCS (Apparent Tardiness Cost with Setups) rule which utilizes some look-ahead parameters for calculating the priority index of each job is proposed. An additional factor for measuring the problem characteristics is introduced and a neural network is utilized to get more accurate values of the look-ahead parameters.