TY - JOUR
T1 - Measuring Risk-associated Activity's Duration
T2 - A Fuzzy Set Theory Application
AU - Ock, Jong Ho
AU - Han, Seung Heon
PY - 2010
Y1 - 2010
N2 - Uncertainty is inherent in the construction projects. Appropriately determining a project schedule under uncertainty is one of the most important factors for a contractor's success in a project. However, when the likelihood of incurring risk events and the riskassociated consequences are uncertain, contractors often face difficulties in estimating project duration. While the Critical Path Method (CPM) has been widely used in scheduling a project, it has been frequently criticized because it assumes an activity's duration deterministic without reflecting uncertainty involved in a project schedule. The Program Evaluation and Review Technique (PERT) and the Monte Carlo Simulation (MCS) technique have been used to reinforce the shortcomings of the CPM through applying probabilistic analysis approach. They, however, still impose a problem of identifying probabilities under the circumstances where schedule variables cannot be defined as probabilistic nature. The main objective of this paper is to present an alternative schedule risk quantification method based on the fuzzy set theory for estimating a risk-associated activity's duration. A hypothetical case study is prepared to show how the proposed method can be put into practice. Interviews with industry experts are also held to verify the usability as well as to identify the pros and cons of the method.
AB - Uncertainty is inherent in the construction projects. Appropriately determining a project schedule under uncertainty is one of the most important factors for a contractor's success in a project. However, when the likelihood of incurring risk events and the riskassociated consequences are uncertain, contractors often face difficulties in estimating project duration. While the Critical Path Method (CPM) has been widely used in scheduling a project, it has been frequently criticized because it assumes an activity's duration deterministic without reflecting uncertainty involved in a project schedule. The Program Evaluation and Review Technique (PERT) and the Monte Carlo Simulation (MCS) technique have been used to reinforce the shortcomings of the CPM through applying probabilistic analysis approach. They, however, still impose a problem of identifying probabilities under the circumstances where schedule variables cannot be defined as probabilistic nature. The main objective of this paper is to present an alternative schedule risk quantification method based on the fuzzy set theory for estimating a risk-associated activity's duration. A hypothetical case study is prepared to show how the proposed method can be put into practice. Interviews with industry experts are also held to verify the usability as well as to identify the pros and cons of the method.
UR - http://www.scopus.com/inward/record.url?scp=77955709609&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=77955709609&partnerID=8YFLogxK
U2 - 10.1007/s12205-010-1003-x
DO - 10.1007/s12205-010-1003-x
M3 - Article
AN - SCOPUS:77955709609
SN - 1226-7988
VL - 14
SP - 663
EP - 671
JO - KSCE Journal of Civil Engineering
JF - KSCE Journal of Civil Engineering
IS - 5
ER -