Abstract
In semiconductor manufacturing, wafer fabrication is the most complicated and important process, and is composed of several hundred process steps and involves several hundred machines. The productivity of the manufacturing process depends mainly on controlling the balance of WIP (work-in-progress) flow to achieve maximum throughput under short manufacturing cycle times. This paper discusses how to determine the proper WIP level for operations, against which balance status can be measured. Balance measurement can be applied in mathematical modelling for bottleneck scheduling and operations management of the fabrication line. Performances are evaluated through computational experiments to show that balance driven management leads to 15-33% more production in 21% shorter manufacturing cycle time than production driven management.
Original language | English |
---|---|
Pages (from-to) | 529-540 |
Number of pages | 12 |
Journal | Production Planning and Control |
Volume | 13 |
Issue number | 6 |
DOIs | |
Publication status | Published - 2002 Sept |
All Science Journal Classification (ASJC) codes
- Computer Science Applications
- Strategy and Management
- Management Science and Operations Research
- Industrial and Manufacturing Engineering