Interactive modeller for equipment operation in long-span bridge construction

Byungil Kim, Changyoon Kim, Wonil Lee, Hyoungkwan Kim

Research output: Contribution to conferencePaperpeer-review

Abstract

Three dimensional (3D) animation of construction simulation makes communication among different project participants effective by visualizing the construction operation. The effect of 3D animation becomes stronger in a more complex operation. However, the modelling process of the 3D animation requires time-consuming efforts. Thus, interactive modelling environment is strongly preferred where equipment, materials, and temporary structures can easily and freely be placed by the construction engineers in a real-time manner. This research aims to develop an equipment operation modeller that can allow users to interactively communicate with the system for long-span bridges. Augmented reality is used as the main methodology for implementing the modeller. The proposed modeller is expected to significantly improve the planning process of construction equipment operations.

Original languageEnglish
Pages280-287
Number of pages8
DOIs
Publication statusPublished - 2010
Event27th International Symposium on Automation and Robotics in Construction, ISARC 2010 - Bratislava, Slovakia
Duration: 2010 Jun 252010 Jun 27

Other

Other27th International Symposium on Automation and Robotics in Construction, ISARC 2010
Country/TerritorySlovakia
CityBratislava
Period10/6/2510/6/27

All Science Journal Classification (ASJC) codes

  • Artificial Intelligence
  • Computer Vision and Pattern Recognition
  • Building and Construction

Fingerprint

Dive into the research topics of 'Interactive modeller for equipment operation in long-span bridge construction'. Together they form a unique fingerprint.

Cite this