Skip to main navigation Skip to search Skip to main content

Association between mutations of critical pathway genes and survival outcomes according to the tumor location in colorectal cancer

  • Dae Won Lee
  • , Sae Won Han
  • , Yongjun Cha
  • , Jeong Mo Bae
  • , Hwang Phill Kim
  • , Jaemyun Lyu
  • , Hyojun Han
  • , Hyoki Kim
  • , Hoon Jang
  • , Duhee Bang
  • , Iksoo Huh
  • , Taesung Park
  • , Jae Kyung Won
  • , Seung Yong Jeong
  • , Kyu Joo Park
  • , Gyeong Hoon Kang
  • , Tae You Kim

Research output: Contribution to journalArticlepeer-review

Abstract

BACKGROUND: Colorectal cancer (CRC) develops through the alteration of several critical pathways. This study was aimed at evaluating the influence of critical pathways on survival outcomes for patients with CRC. METHODS: Targeted next-generation sequencing of 40 genes included in the 5 critical pathways of CRC (WNT, P53, RTK-RAS, phosphatidylinositol-4,5-bisphosphate 3-kinase [PI3K], and transforming growth factor β [TGF-β]) was performed for 516 patients with stage III or high-risk stage II CRC treated with surgery followed by adjuvant fluoropyrimidine and oxaliplatin chemotherapy. The associations between critical pathway mutations and relapse-free survival (RFS) and overall survival were analyzed. The associations were further analyzed according to the tumor location. RESULTS: The mutation rates for the WNT, P53, RTK-RAS, PI3K, and TGF-β pathways were 84.5%, 69.0%, 60.7%, 30.0%, and 28.9%, respectively. A mutation in the PI3K pathway was associated with longer RFS (adjusted hazard ratio [HR], 0.59; 95% confidence interval [CI], 0.36-0.99), whereas a mutation in the RTK-RAS pathway was associated with shorter RFS (adjusted HR, 1.60; 95% CI, 1.01-2.52). Proximal tumors showed a higher mutation rate than distal tumors, and the mutation profile was different according to the tumor location. The mutation rates of Kirsten rat sarcoma viral oncogene homolog (KRAS), phosphatidylinositol-4,5-bisphosphate 3-kinase catalytic subunit α (PIK3CA), and B-Raf proto-oncogene serine/threonine kinase (BRAF) were higher in proximal tumors, and the mutation rates of adenomatous polyposis coli (APC), tumor protein 53 (TP53), and neuroblastoma RAS viral oncogene homolog (NRAS) were higher in distal tumors. The better RFS with the PI3K pathway mutation was significant only for proximal tumors, and the worse RFS with the RTK-RAS pathway mutation was significant only for distal tumors. CONCLUSIONS: A PI3K pathway mutation was associated with better RFS for CRC patients treated with adjuvant chemotherapy, and an RTK-RAS pathway mutation was associated with worse RFS. The significance of the prognostic impact differed according to the tumor location. Cancer 2017;123:3513-23.

Original languageEnglish
Pages (from-to)3513-3523
Number of pages11
JournalCancer
Volume123
Issue number18
DOIs
Publication statusPublished - 2017 Sept 15

Bibliographical note

Publisher Copyright:
© 2017 American Cancer Society

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 3 - Good Health and Well-being
    SDG 3 Good Health and Well-being

All Science Journal Classification (ASJC) codes

  • Oncology
  • Cancer Research

Fingerprint

Dive into the research topics of 'Association between mutations of critical pathway genes and survival outcomes according to the tumor location in colorectal cancer'. Together they form a unique fingerprint.

Cite this