TY - GEN
T1 - A study on the efficient as-built drawing creation using terrestrial LiDAR
AU - Cho, Hyoung Sig
AU - Sohn, Hong Gyoo
AU - Kim, Mikyrong
AU - Moon, Jung Kyun
AU - Han, Soo Hee
PY - 2013
Y1 - 2013
N2 - Facilities are linked very closely with human life and have become bigger and modernized with the rise of civilization. As-built drawing is key factor for management of modern complex facilities. However, as-built drawing is just updated from the execution drawing, not made by actual survey. In this research, as-built drawing of completed tunnel structure was made using terrestrial LiDAR and construction accuracy was confirmed by the drawing. Also, the result was analyzed in terms of efficiency.
AB - Facilities are linked very closely with human life and have become bigger and modernized with the rise of civilization. As-built drawing is key factor for management of modern complex facilities. However, as-built drawing is just updated from the execution drawing, not made by actual survey. In this research, as-built drawing of completed tunnel structure was made using terrestrial LiDAR and construction accuracy was confirmed by the drawing. Also, the result was analyzed in terms of efficiency.
UR - http://www.scopus.com/inward/record.url?scp=84903466124&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84903466124&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:84903466124
SN - 9781629939100
T3 - 34th Asian Conference on Remote Sensing 2013, ACRS 2013
SP - 408
EP - 409
BT - 34th Asian Conference on Remote Sensing 2013, ACRS 2013
PB - Asian Association on Remote Sensing
T2 - 34th Asian Conference on Remote Sensing 2013, ACRS 2013
Y2 - 20 October 2013 through 24 October 2013
ER -